written by: Murray White - Solution Architect with Vision Solutions

The following video demonstrates a migration of a legacy server to a new Dell 12G server, using the Double-Take Move 6.0 product.
 
This specific demonstration is a migration of a Dell 2950 server to a Dell 12G server (P2P) and was conducted on these server models at the Dell TechCenter facility in Round Rock, TX.
 
Key Features of Double-Take Move 6.0
 
* Migrate full servers (P2P, P2V, V2V, V2P)
* Data migration (volume to volume same server or to different server)
* 60 day time limit (from activation) to perform the migration
* Real-time, byte-level replication
* Minimal down-time during cut-over

Demonstration